
PhD thesis proposal : Development of an eco-friendly and resilient building design for an aircraft final assembly line (FAL)
- On-site
- Albi, Occitanie, France
Job description
Institute: IMT Mines Albi, France
Doctoral school: Mécanique, Énergétique, Génie civil et Procédés (MEGEP), University of Toulouse
Laboratory: RAPSODEE – IMT Mines Albi – UMR CNRS 5302, France
Supervisors: Yasmine Lalau, Mathieu Milhé, Elsa Weiss-Hortala
Location: Albi (RAPSODEE CNRS–IMT Mines Albi)
Financial support: DGAC, projet FORCE
Begining: March 2027
Position description:
This work is part of the FORCE project, led by Airbus Operations and funded by DGAC (French Civil Aviation Authority). The project targets the development of a future final assembly line (FAL) facility, which must be more adaptable, more connected, and more environmentally responsible to meet Airbus Operations’ objectives regarding productivity as well as environmental impact (“Net Zero” goals for 2050). The project is divided into several parts, one of which focuses on environmental responsibility.
Airbus Operations produces aircraft with various configurations, which directly impacts the type and duration of assembly operations. Airbus Operations aims to modify the assembly processes by using a moving line. Therefore, this new procedure requires an optimized organization of the FAL building, which must also meet low-energy consumption and low-carbon objectives.
The FORCE project aims to define implementation scenarios for the future final assembly line building (FAL) to minimize its energy and environmental impacts and increase its resilience. It is a follow-up to the TAKT project for which several key design elements still need to be examined. A FAL is a large building (particularly in height), subjected to frequent door opening/closing, and should maintain a specific indoor environment in terms of temperature and humidity to prevent material expansion or contraction, or to ensure the adhesion of sealants, for example. A building of this scale, which includes a moving line, has few partitions and high ceilings, and the floor slab must accommodate the moving line and its power supply (electrical cables or batteries). These structural constraints directly impact the location of heating and air conditioning units as well as humidity sensors. In this specific context, FAL design is a complex challenge requiring the simultaneous optimization of several key parameters.
This optimization requires comparing different scenarios using Dynamic Thermal Simulation (DTS) of the building.
The building’s dimensions, partition layout, and the location of heating and air conditioning units must be optimized while fitting with technical assembly constraints regarding space, connections between spaces, and temperature and humidity control. In a second time, the office area must also be integrated, with a different indoor comfort objective.
Airlocks (dimensions to be studied) are specifically intended to create a buffer effect to facilitate the regulation of indoor air conditions (temperature, humidity) during the door opening and closing. Their layout also depends on the location of the heating and air conditioning units.
Energy consumption is related to heating, air conditioning, and lighting. Indeed, assembly operations require constant lighting at the various assembly stations, sometimes at different heights. Optimizing and standardizing energy consumption related to indoor comfort (temperature, humidity) is particularly complex within the building due to its size and the limited number of available partitions. A study on the integration of renewable energy is planned for both heat and electricity, specifically taking into account direct or indirect electricity supply to the moving line.
The building’s energy and environmental impact, as well as its resilience, based on its location and climatic conditions evolving, given that this building is intended to last for many years. Simulations will therefore be conducted for locations corresponding to increasingly severe weather conditions (temperatures as well as extreme weather events) to test the building’s resilience.
These scientific and technical issues, which are directly related to the FAL building typology and the selected materials, will be addressed through dynamic thermal simulation (DTS) of the usage scenarios under study, a life cycle assessment (LCA) of the building, and impact analyses.
Keywords:
Large-scale industrial building, energy and environmental performance indicators, indoor comfort, resilience, environmentally responsible building, dynamic thermal simulation (DTS)
Skills and profile:
The candidate is expected to hold a master’s degree in energy engineering or performance engineering.
Job requirements
The candidate must have solid knowledge of climate and energy engineering (particularly renewable energy solutions and HVAC systems) and performance management (including industrial performance indicators and energy and environmental indicators). Initial experience in building thermal simulation is required. A first experience linked to the environment of an aircraft final assembly line, and specifically the constraints associated with this type of building, is recommended. Initial experience in life cycle analysis would also be a plus.
or
All done!
Your application has been successfully submitted!
You've already applied for this job
Thank you for your interest - we've already received your application, so this new submission can't be accepted. Your previous application is on file.
